Tech Tip: Battery Discharge at High Temperatures

Tech Tip: Battery Discharge at High Temperatures

Some 1998-2001 1.8L Kia Sephia vehicles built between October 1997 and May 2001, and some 2000-2004 1.8L Spectra vehicles built between February 2000 and March 2004, may exhibit battery discharge when operated in high ambient temperatures for extended periods of time at low speeds or at idle with the A/C, headlamps and other accessories on.

Some 1998-2001 1.8L Kia Sephia vehicles built between October 1997 and May 2001, and some 2000-2004 1.8L Spectra vehicles built between February 2000 and March 2004, may exhibit battery discharge when operated in high ambient temperatures for extended periods of time at low speeds or at idle with the A/C, headlamps and other accessories on.

Typically, this results in customers reporting an inability to restart the vehicle. To reduce the incidence of customer complaints about battery discharge, the following new part is available: new higher capacity alternator battery insulator pad (P/N QK2AA 18590).

Battery Test Procedure:
Test the battery using the Micro 570 tester; refer to TSB, SST 002 for instructions.

Alternator Installation:
1. Relieve fuel system pressure by removing the fuel pump relay and running the engine until it stops.
2. Write down the preset radio stations, then disconnect the negative battery cable.

Warning: Fuel vapors are highly flammable. Death or serious injury could result if they’re ignited. Make sure there are no open flames or cigarette smoking in the area of the repair. Adequate ventilation is necessary to prevent a buildup of fumes, which could ignite, causing fire or explosion.

3. Remove the engine cover, if equipped.
4. Unbolt the cruise control assembly from the bulkhead and lay it on top of the engine.
5. Remove the engine ground strap.
6. Remove the fuel line using the Quick Connect Fuel Line Tool (refer to TSB Fuel 005).
7. Disconnect the alternator electrical connections.
8. Loosen the pivot bolt and belt tensioner bolts. Do not remove them.
9. Relieve the tension on the drive belt by rotating the adjustment bolt.
10. Remove the drive belt from the alternator pulley.
11. Remove the belt tensioner hardware.
12. Remove the alternator pivot bolt.
13. Remove the power steering hose bracket bolt and nut.
14. Move the power steering hose to obtain best access for alternator removal.
15. Remove the alternator from the engine compartment.
16. Install the new alternator onto the pivot bolt (leave it loose).
17. Rotate the upper bracket into position on top of the alternator.
18. Place the belt tensioner hardware on top of the alternator.
19. Install the tensioner mounting bolt (leave it loose).
20. Inspect the alternator drive belt and replace it, if necessary.
21. Place the alternator belt on the alternator pulley.
22. Adjust the alternator belt by rotating the adjustment bolt. Allowable belt deflection: new belt – 0.23-0.31 in. (6-8mm); used belt – 0.28-0.35 in. (7-9mm).
23. Tighten the tensioner bolt to 14-9 ft.-lbs. (19-26 Nm).
24. Tighten the pivot bolt to 28-38 ft.-lbs. (38-51 Nm).
25. Connect the electrical connectors to the alternator assembly.
26. Reinstall the fuel line, engine ground strap, cruise control assembly, power steering hose brackets, fuel pump relay and engine cover.

Battery Insulator Pad Installation:
1. Disconnect the positive battery terminal from the battery.
2. Install the cutout portion of the new battery cover toward the bottom front of the battery.
3. Reconnect the battery cables, positive cable first.
4. Set the clock and pre-set radio stations.
5. Start the engine and verify proper operation.

Courtesy of ALLDATA.

For information on products offered by ALLDATA, visit www.alldata.com.

You May Also Like

CITGO Enters EV Space with Pilot Program Launch

The CITGO location on 11 Mile Road in Michigan now offers both regular transportation fuel and EV charging stations.

CITGO Petroleum Corporation, along with marketer Folk Oil Company, recently launched an electric vehicle (EV) charging pilot program they said is designed to meet the needs of EV drivers in Battle Creek, Mich. The CITGO location at 15551 11 Mile Road now offers both regular transportation fuel and EV charging stations. For added consumer convenience, EV chargers include both Charging System (CCS) and the North American Charging Standard (NACS) plugs, the companies said.

TS Toolbox Guide February 2024

Here’s a look at some of the core feature and modern frills to consider when it’s time to move into a new office.

toolbox guide illustartion
Stellantis Increasing Production of Electric Drive Modules

The company will add EDM production in Szentgotthard, Hungary, targeted to begin in late 2026.

Embracing Cutting-Edge Solutions the Industry has to Offer

Embracing cutting-edge solutions is strategic and imperative for technicians navigating the constantly changing landscape of automotive maintenance and repair.

Nadine Battah
Tool Time Podcast: Clore Automotive

Jim O’Hara from Clore Automotive joins Nadine Battah and Eric Garbe.

Other Posts

TechShop, ShopOwner Offer $50 For Good Guesses

Guess the Tool for a chance at cold hard cash!

GM, Honda Begin Volume Production of Fuel Cell Systems

GM and Honda will produce fuel cells that will be two-thirds less expensive compared to Honda’s 2019 Clarity fuel cell.

Toyota Bringing Battery EV Production to Kentucky

It will invest $1.3 billion at its flagship Kentucky facility for future electrification efforts, including assembly of an all-new, three-row battery electric SUV for the U.S. market.

Repairify Announces Executive Leadership Changes

The company has named Craig Edmonds as president of asTech among other executive appointments.