The MLS gasket was released for production, as a running change, in the 1999 model year for all models except FJ. The new gasket provides superior sealing characteristics, but will require extra care in their installation where a composite gasket was previously in place.

The MLS gasket was released for production, as a running change, in the 1999 model year for all models except FJ.

The new gasket provides superior sealing characteristics but will require extra care in their installation where a composite gasket was previously in place.

Note: This information applies to models with a 2.0L SOHC/DOHC (naturally aspirated) or 2.4L engine.

Caution: Aluminum engine components are susceptible to metal transfer and surface damage when old gasket material is removed from them. Use extreme care when cleaning gasket material from aluminum components. The MLS gasket cannot properly seal if gouging of surfaces, metal transfer or composite gasket material is left on the head or block surfaces.

Equipment Required
1 Plastic or Wooden Scraper
1 2” 3M Roloc Bristle Disc, White (for aluminum surfaces)
1 2” 3M Roloc Bristle Disc, Yellow (for aluminum/cast iron/steel surfaces)
1 2" 3M Roloc Bristle Disc Arbor
1 Drill Motor

Repair Procedure
This bulletin outlines the proper procedures for preparing head/block surfaces for MLS
gasket installation.

1. Following service manual procedures, remove the head.

2. Remove as much of the loose composite gasket material with a plastic or wooden scraper.

Note: Prior to additional cleaning, inspect the cooling passages of the head. Replacement may be necessary if excessive pitting or erosion has taken place that will compromise the sealing surfaces around the cooling passages.

3. Cover coolant and oil passages to the best of your ability and apply solvent or a commercially available gasket cleaner to the head/block surfaces. Allow the solvent to soften the remaining composite gasket material.

4. Using a plastic or wooden scraper, scrape the composite gasket residue from the surfaces. If necessary, apply additional solvent or gasket remover to ease removal.

5. If additional cleaning is needed, use a drill motor and 3M Roloc bristle disc (P/N 07528, white) to carefully remove the remaining gasket material from the head and block surfaces.

Note: If difficult-to-remove residue is left, the yellow Roloc bristle disk (3M P/N 07525) can be used. Use extreme care when power cleaning aluminum surfaces to prevent metal transfer.

6. Inspect the sealing surfaces for any remaining composite gasket residue. Carefully remove any remaining material.

7. The head and block must be checked for flatness. Follow appropriate service manual
procedures/specifications where applicable.

8. Spray both sides of the MLS gasket with a coat of MOPAR spray gasket sealant (P/N
0431 8035).

9. Re-assemble the engine as outlined in the appropriate service manual. Pay particular attention to head bolt torque and torque procedures. All head bolts should be oiled prior to assembly.

Note: The 2.0L DOHC torque and torqueing procedure has changed with the installation of an MLS gasket. Use the following procedures for the 2.0L DOHC only.

10. Make sure the cam sensor seal is replaced on all engine applications.

Note: A new cam sensor seal must be installed during the head gasket replacement procedure. Oil seepage from this seal can be misinterpreted as a head gasket leak.

11. Replace the engine oil and filter after performing these procedures.

2.0L DOHC Torque Procedure with MLS Gasket Installation
Note: The four short bolts are placed in the corners.

A. Torque all center bolts to 25 ft.-lbs. (34 Nm). Torque the four corner bolts to 20 ft.-lbs. (27 Nm). See Figure 1 for torque sequence.

B. Torque all center bolts to 50 ft.-lbs. (68 Nm). Torque the four corner bolts to 35 ft.-lbs. (47 Nm).

C. Re-torque all center bolts to 50 ft.-lbs. (68 Nm). Re-torque the four corner bolts to 35 ft.-lbs. (47 Nm).

D. Tighten all bolts in the specified sequence (Figure 1) an additional 90° (1/4 turn).

Revised 2.4L Cylinder Head Re-torque Procedure
This information supersedes the previous technical bulletin, dated March 25, 2005. The previous bulletin should be removed from your files. This bulletin applies to vehicles equipped with a 2.4L engine built between Feb. 1, 2004 and April 5, 2005.

1. Using a 6” wobble plus extension friction ball and shallow socket following the torque sequence (Figure 1), loosen one bolt at a time to 0 torque and then torque that same head bolt to 60 ft.-lbs.

2. Repeat Step 4 for every head bolt, one bolt at a time in sequence.

3. Verify that each head bolt is at 60 ft.-lbs. before performing next steps.

4. After all head bolts have been verified to be torqued to 60 ft.-lbs., follow the torque sequence and turn the head bolts an additional 90° (1/4 turn) (Figure 1).

5. Following the appropriate procedures, install the cylinder head cover.

Some or all of this information was provided by the Automotive Parts Remanufacturers Association (APRA). For more information on technical bulletins available through APRA, call 703-968-2772 or visit www.AutoBulletins.com.

You May Also Like

Maximize Your Scan Tool

Are you maximizing your scan tools to their full potential? Don’t let them be just an expensive code reader.

Scan Tool

If there’s a truth that extends across all computerized devices, it’s that we likely utilize only a fraction of the things they have the ability to do. Mobile phones are a great example. How many people do you know who only use them for calls, voicemail and text messages? We all know they do so much more.The scan tools we use every day fall into the same category. Are you maximizing yours to their full potential? Don’t let them be just an expensive code reader. That may be easier said than done, because it takes a lot of time to understand both the scan tool and how well it interacts with the vehicles you’re working on, but there are a few factors that can help you dive a little deeper into the functions at your fingertips.

Brake Lathe Basics

Resurfacing drums and rotors is a machining process with its own specific guidelines.

Refrigerant Oil Has to Be Right

Oil type is just as important as oil capacity.

Three bottles of refrigerant oil
Top 5 Tools: Steve Coffell, Auto World, Hazelwood, MO

Steve Coffell, a technician at Auto World in Hazelwood, MO, says his Top 5 Favorite Tools are: Related Articles – Lisle Low Profile Fuel Line Disconnect – Dent Fix Soft-Shock Mallet DF-SM76 Reduces Damage – New ProMAXX Diesel Fuel Injector Seal Puller/Saver ProKits   OTC Genisys Touch – Quick scan, bidirectional control Snap-on VANTAGE Pro

Wheel Bearing Adjustment Tools & Equipment

A wheel bearing that’s out of adjustment can reduce bearing life and can affect more than just the bearing. It’s important to adjust the wheel bearing endplay to the proper specifications. If the bearing set is adjusted too loose or too tight, it can cause the bearing to fail prematurely. There are a few types of assemblies, so using correct procedures and tools will ensure a comeback-free wheel bearing installation.

Other Posts

New Snap-on Limited Edition Speed Demon Roll Cab

Features include next-level organization, durability, security, mobility and exclusive Speed Demon emblem.

Upgrade Your Air System: It’s Easier Than You Think

Improving your shop airflow is only a benefit, unless you like to spend more time, work harder and make less money.

air flow tubes
2024 Is Your Year to Be the Technician You Always Wanted to Be

As we enter 2024, strategic career planning is essential for success in the automotive repair industry.

happy new year 2024
Impact Wrench Technology

Interchangeable anvils are a feature on some new impacts.