LG Energy Solution’s Battery Facility to be Completed by 2026

LG Energy Solution’s Battery Facility to be Completed by 2026

LG Energy Solution said the cylindrical battery plant, called LG Energy Solution Arizona, will produce 46-Series batteries for EVs.

The construction of a major battery manufacturing complex in Arizona, announced by LG Energy Solution last year, is on track to be completed in two years with the first round of hiring expected to begin at the end of this year. The company provided progress updates on its $5.5 billion stand-alone facility during a stakeholder meeting on April 3 at Combs High School in San Tan Valley near the town of Queen Creek where the complex is located.

The attendees included Brian Oh, head of mobility and the IT battery division at LG Energy Solution; Hyung Kim, head of ESS battery division at LG Energy Solution; Richard Ra, president of LG Energy Solution Arizona; Gov. Katie Hobbs of Arizona; Sandra Watson, president and CEO of Arizona Commerce Authority; Mike Goodman, supervisor and chairman of Pinal County; Julia Wheatley, mayor of Queen Creek, and other members of state government and local community officials.

The complex consists of two manufacturing facilities which are the company’s first stand-alone cylindrical and ESS battery plants in North America. LG Energy Solution said the cylindrical battery plant, called LG Energy Solution Arizona, will produce 46-Series batteries for EVs. The company said 46-Series cylindrical batteries demonstrate LG Energy Solution’s advanced technological leadership throughout various applications for EVs.

The ESS battery manufacturing facility, called LG Energy Solution Arizona ESS, will produce lithium iron phosphate (LFP) pouch-type batteries for energy storage systems (ESS), the company said. When fully operational, the complex’s average annual production capacity is expected to reach 53GWh (cylindrical batteries 36GWh, LFP ESS batteries 17GWh).

During the construction progress updates and site tour, Ra said the project has been well underway since the groundbreaking last November, with initial land preparations completed and steel beams now being placed at the site. The manufacturing facility for cylindrical EV batteries is expected to be completed in late 2025, and the facility for LFP pouch-type ESS batteries in the following year.

Once the construction is complete, both facilities are expected to start production in 2026, LG Energy Solution said.

“This transformative investment will have a lasting impact not only in Arizona, but across the country and moves us one step closer toward our clean energy goals,” Governor Katie Hobbs said. “These are the jobs of the future – and the State of Arizona is committed to being an active partner in ensuring Arizonans have the skills to fill these jobs.”

LG Energy Solution has another stand-alone facility in Michigan, which was built a decade ago and is currently undergoing an expansion that would quintuple its average annual production capacity, the company said. The company also has five other joint venture facilities in the U.S. with major automakers, including General Motors, Honda and Hyundai Motors Group.

You May Also Like

New Orleans RTA Selects New Flyer Electric Hybrid Buses

The New Flyer buses will be equipped with the Allison eGen Flex electric hybrid propulsion system.

Allison Transmission, in partnership with New Flyer, announced the selection of Allison-equipped electric hybrid buses by the New Orleans Regional Transit Authority (RTA). The New Flyer buses equipped with the Allison eGen Flex electric hybrid propulsion system will provide a more sustainable transportation solution to the city of New Orleans, RTA said.

Branford Public Schools Award $60M Transportation Contract to Zum

Within five years, Zum will transition Branford to a 100% electric school bus fleet, the first in Connecticut.

Mullen Road Tests Solid-State Polymer Battery Pack

The results met or exceeded all requirements targeted for the first drive cycles for energy usage and driving range.

TurnOnGreen, Endliss Power Team up to Expand EV Charging

TurnOnGreen said it will leverage EPI’s expertise in administering and executing power purchase agreements with commercial clients.

Switch EV Trainer Provides Tailored EV Tech Training

The Switch EV Trainer includes all of the components of a modern EV drivetrain on a compact, insulated, mobile platform.

Other Posts

Elywhere Launches in North America

Elywhere chargers can be configured to support power in the 1 MW range, providing solutions for electric fleets.

Karma Automotive Launches All-Electric Sedan

The Gyesera introduction comes on the heels of the November 2023 debut of the Karma Kaveya Super Coupe.

ChargeLab Study Reveals EV Consumers’ Charging Preferences

While 86% of EV drivers can charge at home, over half still rely on public chargers, according to the survey.

Eaton Adds Software to Optimize At-Home EV Charging

Eaton’s Charging Network Manager software can monitor charging station energy usage in real-time and reallocate power as needed.