Tech Tip: Subaru Cylinder Head Installation

Tech Tip: Subaru Cylinder Head Installation

The AERA (Engine Rebuilders Association) Technical Committee offers the following information regarding cylinder head installation for 2002-'05 Subaru 2.0L DOHC EJ20DT engines. This information is somewhat unique and should be referenced any time a cylinder head is re-installed.

The AERA (Engine Rebuilders Association) Technical Committee offers the following information regarding cylinder head installation for 2002-’05 Subaru 2.0L DOHC EJ20DT engines. This information is somewhat unique and should be referenced any time a cylinder head is re-installed.

This engine requires pre-stressing the cylinder head gasket and then a relaxing procedure when installing the cylinder head. Failure to follow the following procedure (Figure 1, 2002-’05 Subaru 2.0L DOHC cylinder head installation procedure) may result in premature head gasket failure.

Apply a coat of clean engine oil to washers and bolt threads.
1. Torque all bolts to 22 ft.-lbs. (29 Nm) in alphabetical sequence.
2. Torque all bolts to 51 ft.-lbs. (69 Nm) in alphabetical sequence.
3. Loosen all bolts in reverse alphabetical sequence 180°.
4. Loosen all bolts, yet one more time in reverse alphabetical sequence 180°.
5. Torque all bolts 29 ft.-lbs. (39 Nm).
6. Tighten all bolts 80-90° of rotation in alphabetical sequence.
7. Tighten all bolts 40-45° of rotation in alphabetical sequence.
Caution: Do not tighten the bolts more than 40-45°.
8. Further tighten only bolts A and B 40-45° of rotation in alphabetical sequence.

Courtesy of AERA.

You May Also Like

#8 Shop Air Systems

An aging air system can affect the output of air tools and equipment.

Shop Aire Systems

An aging air system can affect the output of air tools and equipment. Often the tools are blamed when a lack of air from corroded, restrictive piping is the culprit. Testing the efficiency of your air system is important, and restoring proper airflow and pressure leads to improved equipment and technician efficiency, as well as energy savings. Updating old or building new, your air system is the heart of your shop.

Mobis Starts Construction of EV Battery System Plant in Spain

The new EV battery system plant will supply Volkswagen and is aiming for mass production by 2026.

#7 Wrenches

Wrenches are the core of every tool collection.

Wrenches
Maverick Tire Changer: Bead Massage

The bead massage feature on the Maverick tire changer helps with better tire and wheel fitment for balancing.

Navistar Surpasses 100 Authorized EV Dealers

Navistar will have more than 30% of its dealer locations ready to support the sale and service of both International and IC Bus EVs.

Other Posts

ADAS: Coming of Age

ADAS are categorized into levels, determined by the amount of automation for any given system.

Hunter Maverick Tire Changer: 19.5-inch Tire Service

Learn to handle 19.5-inch wheels, which are common on some delivery vehicles, with Hunter’s Maverick tire changer.

#6 Multimeter DC Voltage Testing

Diagnosing electrical system problems isn’t always easy, and guessing is never an option.

LG Energy Solution’s Battery Facility to be Completed by 2026

LG Energy Solution said the cylindrical battery plant, called LG Energy Solution Arizona, will produce 46-Series batteries for EVs.