Tech Tip: Volvo Piston Cooling Valve Replacement

Tech Tip: Volvo Piston Cooling Valve Replacement

Use the following procedure to replace the piston cooling valve on model-year 2000 S70, V70 and C70 Volvos.

Use the following procedure to replace the piston cooling valve on model-year 2000 S70, V70 and C70 Volvos.

SERVICE PROCEDURE:
1. Remove the timing belt. See VADIS: Function Group 2, Repair/Removal, replacement and installation, Section 21 Engine, Replacing the timing belt/idler pulley/belt tensioner.
2. Remove the timing belt tensioner.
3. Remove the ider pulley.
4. Remove the screw securing the inner timing cover to the cylinder head.
5. Raise the car. Continue with VADIS method: Replacing the timing belt/idler pulley/belt tensioner.
6. Remove the vibration damper.
7. Remove the two screws (see Fig. 1, 1) securing the inner timing cover to the cylinder block.
8. Lower the belt guard at the oil pump housing.
9. Press the inner timing cover off the flange around the coolant pump. Start at the lower edge of the pump.
10. Hold the cover out of the way. Remove the piston cooling valve (See Fig. 1, 2) and the seal washer.
11. Install a new piston cooling valve (P/N 9497918) and the seal washer (P/N 11998).
12. Install the inner timing cover. First press the cover into place over the flange at the top of the coolant pump. Then press the remaining section of the cover into place over the flange around the pump. Check that the cover is positioned correctly.
13. Install the two screws securing the inner timing cover to the cylinder block.
14. Install the lower belt guard.

Technical service bulletin courtesy of Mitchell 1.

For more information on Mitchell 1 products and services, automotive professionals can log onto the company’s website at www.mitchell1.com.

You May Also Like

#8 Shop Air Systems

An aging air system can affect the output of air tools and equipment.

Shop Aire Systems

An aging air system can affect the output of air tools and equipment. Often the tools are blamed when a lack of air from corroded, restrictive piping is the culprit. Testing the efficiency of your air system is important, and restoring proper airflow and pressure leads to improved equipment and technician efficiency, as well as energy savings. Updating old or building new, your air system is the heart of your shop.

Mobis Starts Construction of EV Battery System Plant in Spain

The new EV battery system plant will supply Volkswagen and is aiming for mass production by 2026.

#7 Wrenches

Wrenches are the core of every tool collection.

Wrenches
Maverick Tire Changer: Bead Massage

The bead massage feature on the Maverick tire changer helps with better tire and wheel fitment for balancing.

Navistar Surpasses 100 Authorized EV Dealers

Navistar will have more than 30% of its dealer locations ready to support the sale and service of both International and IC Bus EVs.

Other Posts

ADAS: Coming of Age

ADAS are categorized into levels, determined by the amount of automation for any given system.

Hunter Maverick Tire Changer: 19.5-inch Tire Service

Learn to handle 19.5-inch wheels, which are common on some delivery vehicles, with Hunter’s Maverick tire changer.

#6 Multimeter DC Voltage Testing

Diagnosing electrical system problems isn’t always easy, and guessing is never an option.

LG Energy Solution’s Battery Facility to be Completed by 2026

LG Energy Solution said the cylindrical battery plant, called LG Energy Solution Arizona, will produce 46-Series batteries for EVs.